• Clock:
    01:20 AM
  • Date:
    Wednesday 25 Jan 2017
  • Weather:
     
67

The First Vice President of the Republic to launch the work of the project of Pipeline of Petroleum Products Khartoum Medani

11 Jan 2017 Vice President

L.General Bakri Haassan Salih,theFirst Vice President of the Republic launched the work of the Pipeline of petroleum  products(Khartoum,Medani) that took place in Alrawaian Station in Aljaili,confirming that this pipeline considered as an achievement through which it supports six states  Aljazira,Sennar,WhiteNile,BlueNile,Kassala and Algadarif ,adding that this piplines will reduce the costs that was taken by transport as well as the safety and security.

Also Read..

نائب رئيس الجمهورية يبحث مع السكرتير التنفيذي لمنظمة البحيرات التحديات التي تواجه عمل المنظمة

23 Jan 2017 Vice President

بحث نائب رئيس الجمهورية الأستاذ حسبو محمد عبدالرحمن لدى لقائه بمكتبه بالقصر الجمهوري السكرتير التنفيذي لمنظمة البحيرات بحضور كمال الدين إسماعيل وزير الدولة بالخارجية

نائب رئيس الجمهورية يترأس اجتماع الآلية رفيعة المستوى الخاصة بمعالجة القضية الليبية

23 Jan 2017 Vice President

ترأس السيد حسبو محمد عبد الرحمن نائب رئيس الجمهورية بالقصر الجمهوري اجتماع مجموعة الآلية رفيعة المستوى الخاصة بمعالجة القضية الليبية

النائب الأول لرئيس الجمهورية يلتقي وزير العمل

23 Jan 2017 Vice President

التقي النائب الأول لرئيس الجمهورية الفريق أول ركن بكري حسن صالح بمكتبه بالقصر الجمهوري د. أحمد بابكر نهار وزير العمل والإصلاح الإداري، ووجه النائب الأول لرئيس الجمهورية وزارة العمل والإصلاح الإداري بإعداد تصوُّر لإنشاء مراكز نموذجية للتدريب المهني بكل ولايات السودان بما يلبي احتياجات الولايات من ...

Newsletter

تابعونا وشاهدونا أولاً بأول لنحظى بتشجيعكم دومًا! تعرّفوا على أحدث الأخبار الخاصة بالموقع والمبادرات الحكومية من خلال نشراتنا البريدية.

AboutSudan

SudanAnthem